SOME OF ONGOING AND COMPLETED PROJECTS

Milto Engineering has successfully conducted various water sources studies and investigations using most recent surveying methods and instruments, GIS and Remote sensing techniques, field surveys of integrated Geological, Hydrological, Hydrogeological and Geophysical investigations. In addition we have conducted a number of Geophysical loggings, Borehole Camera Record & Electromechanical design works. 

Slide 1

Oct 15, 2024 by Milto Engineering

Hydrogeological Investigation and Drilling Supervision
Image is not available

Project: Hydrogeological investigation and drilling supervision for Bulbula Branch Building
Location: Addis Ababa
Status: Completed

Slide 3
Slide 2
previous arrowprevious arrow
next arrownext arrow

Hydrogeological investigation and drilling supervision of water supply wells for Addis Ababa Bole international airport.

Kibish Construction (Design Build Contractor), TARN (Design consultant), Milto Engineering plc (Sub design consultant for hydrogeological investigation & drilling supervision)

Location: Addis Ababa
Status: Completed

Hydrogeological and Geophysical Investigation for Tsedey Bank (S.C) Headquarter Building Water Supply Well Sitting & Drilling supervision

Location: Addis Ababa
Status: Completed

Hydrogeological and Geophysical Investigation

Project: Hydrogeological and geophysical investigation for Chebera Churchura Luxury
Lodge water well drilling site selection.
Location: Chebera Churchura, SWER
Status: Completed

Hydrogeological And Geophysical Survey

Water Supply, Sanitation and Hygiene Project Environmental and Social Impact Assessment Study

Project: Hydrogeological And Geophysical Survey for  Drilling Site Selection in Edeneba Kebele, Mitto Wereda, Siltie Zone

Edeneba Kebele Water  Supply, Sanitation              and Hygiene Project

Environmental                  and Social Impact Assessment Study
Location: 
Status: Completed

Slide 1

Oct 15, 2024 by Milto Engineering

Hydrogeological and Geophysical Survey
Image is not available

Hydrogeological and geophysical survey for Aba’ala primary hospital water supply well sitting, well design, and drilling specification preparation

Location: Aba’ala, Afar Regional State
Status: Completed

Slide 2
Slide 3
previous arrowprevious arrow
next arrownext arrow

Geophysical Investigation (VES) at 18 Points

Project: Geophysical Investigation (VES) at 18 Points
Location: Shinile and Adigala Wereda of Somali Regional State
Status: Completed

Drilling Supervision

Project: Drilling supervision of Asayita Refugee Camp water supply well
Location: Asayita, Afar Regional State
Status: Completed